At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
5.0(813 Votes)
Quiz
Question 1/101/10
Scenario: Rollins Manufacturing
Please read this scenario prior to answering the question
Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland,
Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these
plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production
scheduling, and custom developed applications that drive the automated production equipment at
each plant.
Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency
of all of its production operations. During a recent exercise held for internal quality improvement, it
was determined that a significant reduction in process waste could be achieved by replacing the
current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system
located in the Cleveland data center. This central system would provide support to each of the plants
replacing the functionality in the existing systems. It would also eliminate the need for full data
centers at each of the plant facilities. A reduced number of IT staff could support the remaining
applications. In some cases, a third-party contractor could provide those staff.
The Rollins Enterprise Architecture department has been operating for several years and has mature,
well-developed architecture governance and development processes that are strongly based on
TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture
Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The
request covered the initial architectural investigations and the development of a comprehensive
architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project
team has been asked to develop an Architecture Vision that will achieve the desired outcomes and
benefits. Some of the plant managers have expressed concern about the security and reliability of
driving their MRPII and production scheduling from a central system located in Cleveland. The Chief
Engineer wants to know how these concerns can be addressed.
Refer to the Rollins Manufacturing Scenario
You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture
project.
One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a
set of IT principles and architecture principles that are well aligned with the overall enterprise
principles. These now need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a
robust solution.
[Note: You should assume that Rollins has adopted the example set of principles that are listed and
defined in TOGAF 9, Section 23.6.]
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability,
Control Technical Diversity.
B.
Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change
Management.
C.
Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is
Shared, Data is Accessible, Data is Secure.
D.
Information Management is Everybody's Business, IT Responsibility, Data Trustee, Technology
Independence, Responsive Change Management.
Right Answer: C
Quiz
Question 2/102/10
Scenario: Global Mobile 1
Please read this scenario prior to answering the question
Global Mobile is a mobile telecommunications company formed through a series of mergers and
acquisitions. They are yet to fully integrate the customer service systems for the most recent
acquisitions, and as result, customer service has been a major concern for the Chief Technology
Officer.
Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the
customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing
group has published some new findings about customer satisfaction. The customers appear to be
switching to Air Light, a competitor, because of superior customer service. Global Mobile actually has
better coverage in nearly all markets than Air Light, and good roaming agreements that keep rates
low for business travelers. But, customer satisfaction has remained low.
The Business Strategy group and the Enterprise Architecture group have conducted a high-level
project to develop the enterprise-wide strategic plan. They have developed a business scenario
which contains a good conceptual model of what needs to be done, and also identifies the key
requirements. This was used in preparing the proposal presented to the Executive Council and the
Corporate Board.
The planning for the program has been underway for several months. Global Mobile has selected
TOGAF 9 as the basis for its Enterprise Architecture.
The Corporate Board has approved funding for a multi-million Euro conversion to transition to a
packaged Customer Service System. It is anticipated that the overall program will take five years to
complete, but there are some tactical projects that can commence immediately to address the
situation. The Corporate Board has placed one additional major constraint on the program. In
addition to achieving the business outcomes directly related to improving overall customer service
within each business unit, the Corporate Board expects the Target Architecture to produce an
additional saving of at least 30% over current operating costs through energy efficiency initiatives,
virtualization of servers and workstations, and expanded telecommuting and desk-sharing. This
Green initiative is intended to become a model for future investments at all company facilities
worldwide.
Refer to Global Mobile scenario
You have been engaged as a consultant to advise the Chief Architect on the best ways to approach to
the implementation planning activities for this significant business transformation.
Based on TOGAF 9, which of the following is the best answer? (Is this the right answers to choose?)
Select the answer:Select the answer
1 correct answer
A.
You recommend using conventional implementation planning techniques. The horizontal scope of
the Green initiative would make the Capability-Based Planning approach used in the organization's
TOGAF-based Enterprise Architecture framework difficult to manage and govern. This approach to
planning was better applied within the vertical scope of a business unit.
B.
You recommend that the implementation planning activities be conducted using Capability-Based
Planning. This is appropriate because the Green initiative is an enterprise-wide plan with a horizontal
scope. Its metrics are aggregated at the enterprise level. It is crucial to gain business unit support and
cooperation to achieve the broader business outcomes which will benefit all.
C.
The Capability-Based Planning approach used in the organization's TOGAF-based Enterprise
Architecture framework is focused on business outcomes. The Green initiative is an infrastructure
program that is technical in nature; therefore, it would not be appropriate to use the Capability-
Based Planning approach. Instead, the Global Mobile systems development lifecycle approach should
be utilized to develop the Solution Architecture.
D.
You recommend using conventional implementation planning techniques. The Capability-Based
Planning approach is normally only used in public sector, defense-related programs. This approach is
not appropriate for a private sector company.
Right Answer: B
Quiz
Question 3/103/10
Scenario: AGEX Inc.
Please read this scenario prior to answering the question
AGEX is a large, global commodities trading company which has been growing rapidly through a
series of acquisitions.
Each new business is performing well in its markets. However, the lack of integration between
headquarters and the business units has increasingly caused problems in the handling of customer
and financial information. The inability to share information across businesses has resulted in lost
opportunities to "leverage the synergies" that had been intended when the businesses were
acquired. At present, each business unit maintains its own applications. Despite an earlier initiative
to install a common application to manage customer, products, supplier, and inventory information,
each business unit has different ways of defining each of these core elements and has customized the
common application to the point where the ability to exchange information is difficult, costly, and
error-prone.
As a result, AGEX has begun implementing a single Enterprise Resource Planning (ERP) system to
consolidate information from several applications that exist across the lines of business. The
Corporate Board is concerned that the new ERP system must be able to manage and safeguard
customer information in a manner that meets or exceeds the legal requirements of the countries in
which the company operates. This will be an increasingly important capability as the company
expands its online services offered to clients and trading partners.
The CIO has formed an Enterprise Architecture department, and one of the primary goals in its
charter is to coordinate efforts between the ERP implementation team and the business unit
personnel who will be involved in the migration process. The CIO has also formed a cross-functional
Architecture Review Board to oversee and govern the architecture.
After reviewing the available alternatives, and based on recommendations from the ERP vendor,
AGEX has selected TOGAF 9 as the basis for its Enterprise Architecture program.
The CIO has endorsed this choice with the full support of top management.
Refer to the AGEX Inc. Scenario
You are serving as the Chief Architect.
You have been asked to recommend the approach to take in the Preliminary Phase to ensure that the
Corporate Board's concern is addressed.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
You evaluate the implications of the Board's concern in terms of regulatory and security policy
requirements. You then update the AGEX security policy to reflect the concern, ensuring that this
policy is communicated across the organization.You allocate a security architecture team to ensure
that security considerations are included in ongoing architecture planning. You then assess the
security implications and agreements within the AGEX businesses and their suppliers.
B.
You evaluate the implications of the Board's concern in terms of regulatory requirements and their
impact on business goals and objectives. Based on this understanding, you then issue a Request for
Architecture Work to commence an architecture development project to develop a solution that will
address the Board's concern.You allocate a security architect to oversee the implementation of the
solution in the ERP system that is being developed.
C.
You start by clarifying the intent that the Board has for raising this concern. This enables you to
understand the implications of the concern in terms of regulatory requirements and the potential
impact on current business goals and objectives.You propose that a security architect or security
architecture team be allocated to develop comprehensive security architecture.
D.
You evaluate the implications of the Board's concern by examining the potential impacts on
business goals and objectives. Based on your understanding, you then update the current AGEX
security policy to include an emphasis on the Board's concern.In addition, you allocate a security
architect to ensure that security considerations are included in the architecture planning for all
domains.
Right Answer: A
Quiz
Question 4/104/10
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large-scale
commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm
Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a
different manufacturer that builds and sells complete systems. The turbine blades are custom
engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics.
However, recent improvements in composite materials, coupled with enhanced automated methods
for precision application of materials during the molding process, have led to significant reduction in
weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the
development of a proprietary automated process for continuous extrusion of the turbine blades.
Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross-functional
Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor
the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated
manufacturing processes and systems that are used to design, manufacture, and test the blade
assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise
Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained
and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard
approach for controlling the Automated Test System that is used at each plant to perform final
quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board
approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the
new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed
concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario
You are the Lead Architect for this activity.
You have been asked to recommend the best approach to adopt to address the Chief Engineer's
concern.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
You create an Architecture Contract to manage and govern the implementation and migration
process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal
contract. For internal development projects, you decide it is adequate to utilize a memorandum of
understanding between the Manufacturing Architecture Board and the implementation
organization.You recommend that if a deviation from the contract is detected, the Manufacturing
Architecture Board should modify the Architecture Contract to allow the implementation
organization the ability to customize the process to meet their local needs. As a result, you then issue
a new Request for Architecture Work to implement the modified Architecture Definition.
B.
You create an Architecture Contract to manage and govern the implementation and migration
C.
process. If the contract is issued to an external party, you ensure that it is a fully enforceable
legal contract. For internal envelopment projects, you decide it is adequate to utilize a
memorandum of understanding between the Manufacturing Architecture Board and the
implementation organization.You recommend that if a deviation from the Architecture Contract
is detected, the Manufacturing Architecture Board grant a dispensation to allow the implementation
organization the ability to customize the process to meet their local needs.
D.
You create an Architecture Contract to manage and govern the implementation and migration
process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal
contract. For internal development projects, you decide it is adequate to utilize a memorandum of
understanding between the Manufacturing Architecture Board and the implementation
organization.You ensure that the Manufacturing Architecture Board reviews all deviations from the
Architecture Contract, and considers whether or not to grant a dispensation to allow the
implementation organization to customize the process to meet their local needs.
E.
You create an Architecture Contract to govern the implementation and migration process at each
site. If the contract is issued to an external party, you ensure that it is a fully enforceable legal
contract. You ensure that the contract addresses the project objectives, effectiveness metrics,
acceptance criteria, and risk management.You then schedule compliance reviews at key points in the
implementation process to ensure that the work is proceeding in accordance with the Architecture
Definition. Based on the results, you ensure that the Manufacturing Architecture Board reviews all
deviations from the Architecture Contract, and considers whether or not to grant a dispensation to
allow the implementation organization to customize the process to meet their local needs.
Right Answer: D
Quiz
Question 5/105/10
Scenario: Vittronics Ltd.
Please read this scenario prior to answering the question
Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for
Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in
the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects
an increase in stress induced by the onset of a migraine headache.
This technology will be a breakthrough in the treatment of this condition, and several competitors
are striving to be the first to introduce a product into the market. However, all of them must
demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy
the regulatory requirements of the countries in the target markets.
The Enterprise Architecture group at Vittronics has been engaged in an architecture development
project to create a Secure Private Immersive Collaborative Environment (SPICE) that will allow
researchers at its product development laboratories worldwide to share information about their
independent clinical trials.
The Vittronics Enterprise Architecture group is a mature organization that has been utilizing TOGAF
for several years. They have recently upgraded to TOGAF 9. The Vittronics Architecture Development
Method (VADM) is strictly based on the TOGAF 9 Architecture Development Method (ADM) with
extensions required to support current good manufacturing practices and good laboratory practices
in their target markets.
The SPICE project team has now completed the Business, Information Systems, and Technology
Architecture phases and has produced a complete set of deliverables for each phase. Due to the
highly sensitive nature of the information that is managed in SPICE, special care was taken to ensure
that each architecture domain included an examination of the security and privacy issues that are
relevant for each domain. A corresponding SPICE Security Architecture has been defined.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture
activity.
Refer to the Vittronics Ltd Scenario
You are serving as the Lead Architect for the SPICE project team.
As required by TOGAF, the SPICE project team res completed a Business Transformation Readiness
Assessment in Phase A (Architecture Vision). In that assessment, it was determined that there are
risks associated with the adoption of the Immersive Collaborative Environment. Despite a clear
expression of the vision and the business need for utilizing SPICE to accelerate the clinical trials, the
researchers have been resisting the change because of concerns about safeguarding individually
identifiable information about the subjects who were participating in the trials.
You have been asked to recommend how this situation be managed in the implementation planning
phases.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
You decide that in Phase E, the team creates an overall solutions strategy that can guide the Target
Architecture implementation and structure the Transition Architectures. You check that there is
consensus before proceeding.
B.
You decide to return to Phase A, where the team should brainstorm a technical solution that
mitigates the residual risks presented by the privacy issue. Then, during Phase D, you will direct the
team to develop an Architecture Building Block to manage the security risks. After that, the team
should select Solution Building Blocks that mitigate all of the identified risks and revise the
Requirements Impact Statement to reflect the changes to the high-level solutions strategy and
migration plan.
C.
You decide that in Phase E, the team review the Business Transformation Readiness Assessment
and identify, classify, and mitigate the risks associated with the identified readiness factors. If the
risks can be satisfactorily mitigated, then you would continue to define a high-level solutions strategy
that includes the Transition Architectures needed to make the change culturally and technically
feasible.
D.
You decide that in Phase E, the team determines an approach to implementing an overall strategic
direction that will address and mitigate the risks identified.
Right Answer: C
Quiz
Question 6/106/10
Scenario: Florian Flowers BV
Please read this scenario prior to answering the question
Florian Flowers BV is an international agricultural company exporting flowers and seeds worldwide.
Florian is headquartered in Rotterdam in the Netherlands, and has sales and distribution centers in
over 60 countries worldwide. Several of these centers include administrative, manufacturing, and
research facilities.
To achieve full integration of their research capabilities with their development centers located in
various climate zones, Florian wants to develop strong self-directed teams in each location. Florian
also wants to define new business models that are profitable while reducing their impact on the
environment. Florian management is deeply committed to ensuring that the company is a world
leader in socially responsible seed development with a business strategy that focuses on profitability
through environmentally friendly operating processes.
Florians international operations are subject to various legal and regulatory requirements. In areas
such as genetically modified seeds, governmental controls are strictly enforced and compliance is
critical. Recently a competitor was heavily fined for violating the regulations in a country where it
was developing pest-resistant seeds.
The Governing Board is concerned, and as a result has approved the expenditure of resources to
establish an Enterprise Architecture program. They have requested to be informed about the status
of projects that could impact regulatory compliance. They also want to enable the corporate legal
staff and auditors to analyze proposed architectures to ensure that they are within the legal
guidelines for a given location. In addition, the research organization should be able to see that the
architecture is appropriate for its needs.
TOGAF 9 has been mandated as the guiding framework for the development and evolution of the
Enterprise Architecture practice.
Refer to the Florian Flowers BV Scenario
Florian management has engaged you as the Lead Consultant to assess the current situation.
You have been asked to recommend an approach that would enable the development of an
architecture that addresses the needs of all these parties.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
Depending on the nature of the architecture, a set of models should be created that can be used
to ensure that the system will be compliant with the local regulations. Stakeholders should be able to
view the models to see that their concerns have been properly addressed.
B.
Each architecture activity should be developed using a consistent modeling approach that is
uniform across all architecture projects. Each architecture should be defined based on this fixed set
of models so that all concerned parties can examine the models to ensure that their issues and
concerns have been accessed.
C.
For those groups that have sufficient power and level of interest, a special report should be
created that summarizes the key features of the architecture with respect to the particular location.
Each of these reports should reflect the stakeholders' requirements.
D.
It would be beneficial to develop a stakeholder map that allows the architects to define groups of
stakeholders that share common concerns. A set of views should be defined that addresses the
concerns each group. Architecture models can then be created for each view to address the
stakeholders' concerns.
Right Answer: D
Quiz
Question 7/107/10
Scenario: Armstrong Defense Industries
Please read this scenario prior to answering the question
Armstrong Defense Industries is the prime contractor for the Dreadnought Unmanned Aircraft
System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited
numerous different procurement processes and related IT systems. Armstrong Defense is moving
aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has
announced that the company will seek to leverage higher volume discounts and lower related IT
support costs by instituting a preferred supplier program.
To achieve this goal, Armstrong Defense needs to define Baseline and Target Architectures. These
architectures must address key stakeholders concerns such as:
1. What groups of people should be involved in procurement-related business processes?
2. What current applications do those groups use?
3. Which procurement-related business processes are supported by zero, one, or many existing
applications?
4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects?
5. What non-procurement applications will need to be integrated with any new procurement
applications?
6. What data will need to be shared?
At present, there are no particularly useful architectural assets related to this initiative. All assets
need to be acquired and customized or created from scratch. The company prefers to implement
existing package applications from systems vendors with little customization.
The architecture development project has just completed its Architecture Context iteration cycle and
is about to begin the Architecture Definition iteration cycle.
Armstrong Defense is using TOGAF for its internal Enterprise Architecture activities. It uses an
iterative approach for executing Architecture Development Method (ADM) projects.
Refer to the Armstrong Defense Industries Scenario
You are serving as the Lead Architect.
You have been asked to identify the most appropriate architecture viewpoints for this situation.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
In the early iterations of the Architecture Definition: • Describe the Baseline Business Architecture
with a Baseline Business Process catalog• Describe the Baseline Application Architecture with a
Technology Portfolio catalog• Describe the Baseline Data Architecture with a Data diagramIn the
later iterations of the Architecture Definition: • Describe the Target Business Architecture with an
Actor/Process/Data catalog• Describe the Target Application Architecture with a System/Technology
matrix• Describe the Target Data Architecture with a Data Dissemination diagram
B.
In the early iterations of the Architecture Definition: • Describe the Target Business Architecture
with a Business Service/Function catalog and a Business Interaction matrix• Describe the key
business objects with Product Lifecycle diagrams• Describe the Target Application Architecture with
Application Communication diagrams and an Application Interaction matrix• Describe the Target
Data Architecture with a Data Entity/Business Function matrix and a System/Data matrixIn the later
iterations of the Architecture Definition: • Describe the Baseline Business Architecture with a
Business Service/Function catalog and a Business Interaction matrix• Describe the Baseline
Application Architecture with a System/Organization matrix and a System/Function matrix• Describe
the Baseline Data Architecture with a Data Entity/Data Component catalog
C.
In the early iterations of the Architecture Definition: • Describe the Target Business Architecture
with a Business Service/Function catalog and an Organization/Actor catalog• Describe the key
business objects with Data Lifecycle diagrams• Describe the Target Application Architecture with
Application Communication diagrams and an Application Interaction matrix• Describe the Target
Data Architecture with a System/Data matrixIn the later iterations of the Architecture Definition: •
Describe the Baseline Business Architecture with a Business Service/Function catalog and a Business
Interaction matrix• Describe the Baseline Application Architecture with an Application and User
Location diagram and a System/Function matrix• Describe the Baseline Data Architecture with a Data
Entity/Data Component catalog
D.
In the early iterations of the Architecture Definition: • Describe the Baseline Business Architecture
with an Organization/Actor catalog• Describe the Baseline Application Architecture with a
E.
System/Function matrix• Describe the Baseline Data Architecture using a Data Entity/Data
Component catalogIn the later iterations of the Architecture Definition: • Describe the Target
Business Architecture with en Organization/Actor catalog• Describe the Target Application
Architecture using Application Communication diagrams end an Application Interaction matrix•
Describe the Target Data Architecture with a System/Data matrix
Right Answer: B
Quiz
Question 8/108/10
Scenario: St. Croix Consulting
Please read this scenario prior to answering the question
St. Croix Consulting started as an accounting and financial services company. It has expanded over
the years and is now a leading North American IT and Business Services provider.
With numerous practice areas and a multitude of diverse engagements underway at any given time,
overall engagement management has become challenging. The company does not want to risk its
outstanding reputation or its international certifications and CMM ratings. Senior partners must
become team players, working to support the broader needs of the company and its shareholders.
The Enterprise Architecture team has been working to create St. Croixs Enterprise Architecture
framework to address these issues. The team has defined a preliminary framework and held
workshops with key stakeholders to define a set of principles to govern the architecture work. They
have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for
the four domains. They have set out an ambitious vision of the future of the company over a five-
year period.
An Architecture Review Board has been formed comprised of IT staff executives and executives from
the major practice areas.
The Enterprise Architecture framework is based on TOGAF 9.
The Chief Executive Officer and Chief Information Officer have co-sponsored the creation of the
Enterprise Architecture program.
Refer to the St Croix Consulting Scenario
You have been assigned to the role of Chief Enterprise Architect.
As the EA team prepares to formulate an Implementation plan, they have been asked by the CIO to
assess the risks associated with the proposed architecture. He has received concerns from senior
management that the proposed architecture may be too ambitious and they are not sure it can
produce sufficient value to warrant the attendant risks.
You have been asked to recommend an approach to satisfy these concerns.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
An interoperability analysis should be applied to evaluate any potential issues across the Solution
Architecture. Once all of the concerns have been resolved, the EA team should finalize the
Architecture Implementation Roadmap and the Migration Plan.
B.
The EA team should gather information about potential solutions from the appropriate sources.
Once the Solution Architecture has been assembled, it should be analyzed using a state evolution
table to determine the Transition Architectures.
C.
Prior to preparing the Implementation plan, the EA team should create a consolidated gap analysis
to understand the transformations that are required to achieve the proposed Target Architecture.
The EA team should gather information about potential solutions from the appropriate sources.
Once the Solution Architecture has been assembled, it should be analyzed using a state evolution
table to determine the Transition Architectures. An interoperability analysis should be applied to
D.
evaluate any potential issues across the Solution Architecture.
E.
Prior to preparing the Implementation plan, there are several techniques that should be applied to
assess the risks and value of the proposed transformation. In particular, the EA team should pay
attention to the Business Transformation Readiness Assessment and the Business Value Assessment.
Right Answer: C
Quiz
Question 9/109/10
Scenario: Zephyr Enterprises
Please read this scenario prior to answering the question
Zephyr Enterprises specializes in the development of wind turbine blades for use in large-scale
commercial wind energy production systems. Zephyr has manufacturing facilities located in Palm
Springs, California, Omaha, Nebraska, and Winnipeg, Ontario. Each of these plants supplies a
different manufacturer that builds and sells complete systems. The turbine blades are custom
engineered to meet each manufacturers design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics.
However, recent improvements in composite materials, coupled with enhanced automated methods
for precision application of materials during the molding process, have led to significant reduction in
weight, increase in strength, and greatly improved blade longevity. Zephyr has pioneered the
development of a proprietary automated process for continuous extrusion of the turbine blades.
Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
Zephyr has a mature Enterprise Architecture organization that is supported by a cross-functional
Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor
the Enterprise Architecture program.
Zephyr has used TOGAF and its Architecture Development Method (ADM) to develop its automated
manufacturing processes and systems that are used to design, manufacture, and test the blade
assemblies. They have recently updated to TOGAF 9 and have adapted the Zephyr Enterprise
Architecture to closely follow the TOGAF 9 framework. All of Zephyrs IT architects have been trained
and certified on TOGAF 9.Recently, an architecture project was completed that defined a standard
approach for controlling the Automated Test System that is used at each plant to perform final
quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board
approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the
new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed
concern that a uniform process be employed at each site to ensure consistency.
Refer to the Zephyr Enterprises Scenario
You have been assigned by the Lead Architect for the Automated Test System controller project to
conduct Compliance Assessments at each manufacturing plant.
During the course of the assessment at the Omaha plant, you discover that the Distributed Data
Acquisition System they have purchased uses a proprietary Remote Procedure Call (RPC) that utilizes
kernel mode threads instead of the user mode threads that are specified in the Architecture
Definition Document. In all other respects, the system meets the requirements stated in the
Architecture Definition Document and seems to perform correctly.
You have been asked to describe the compliance of this system for the final report.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
You observe that all of the features in the Architecture Definition Document have been
implemented in accordance with the specification, except for the RPC mechanism. Your
recommendation is that the system be described as conformant.
B.
You observe that the system has many features in common with the Architecture Definition
Document, and those features have been implemented in accordance with the specification.
However, you note that the RPC mechanism has been implemented using features that are not
covered by the specification. Your recommendation is that the system be described as consistent.
C.
You observe that the implementation of the RPC mechanism has no features in common with the
Architecture Definition Document, therefore the question of its conformance should not be
considered. Your recommendation is that the system be described as consistent.
D.
You observe that the system meets most of the requirements stated in the Architecture Definition
Document and appears to work correctly. However, you note that the RPC mechanism has not been
implemented according to the specification. Your recommendation is that the system be described as
non-conformant.
Right Answer: D
Quiz
Question 10/1010/10
Scenario: Rollins Manufacturing
Please read this scenario prior to answering the question
Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland,
Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these
plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production
scheduling, and custom developed applications that drive the automated production equipment at
each plant.
Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency
of all of its production operations. During a recent exercise held for internal quality improvement, it
was determined that a significant reduction in process waste could be achieved by replacing the
current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system
located in the Cleveland data center. This central system would provide support to each of the plants
replacing the functionality in the existing systems. It would also eliminate the need for full data
centers at each of the plant facilities. A reduced number of IT staff could support the remaining
applications. In some cases, a third-party contractor could provide those staff.
The Rollins Enterprise Architecture department has been operating for several years and has mature,
well-developed architecture governance and development processes that are strongly based on
TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture
Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The
request covered the initial architectural investigations and the development of a comprehensive
architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project
team has been asked to develop an Architecture Vision that will achieve the desired outcomes and
benefits. Some of the plant managers have expressed concern about the security and reliability of
driving their MRPII and production scheduling from a central system located in Cleveland. The Chief
Engineer wants to know how these concerns can be addressed.
Refer to the Rollins Manufacturing Scenario
You are serving as the Lead Enterprise Architect of the newly-formed Common ERP Deployment
architecture project team.
As the Common ERP Deployment architecture project team assembles for its initial meeting, many of
the participants have voiced concerns about the sweeping scope of the initiative. Others are
confident that they know a solution that will work. During the meeting, a number of alternative
recommendations for how to proceed are put forward by members of the team.
You have been asked to select the most appropriate recommendation to ensure that the team
evaluates different approaches to the problem and clarifies the requirements for the architecture.
Based on TOGAF 9, which of the following is the best answer?
Select the answer:Select the answer
1 correct answer
A.
The team should hold a series of interviews at each of the manufacturing plants using the business
scenario technique. This will then enable them to identify and document the characteristics of the
architecture from the business requirements.
B.
The team should exercise due diligence and carefully research vendor literature and conduct a
series of briefings with vendors that are on the current approved supplier list. Based on the findings
from the research, the team should define a preliminary target Architecture Vision. The team should
then use that model to build consensus among the key stakeholders.
C.
The team should create Baseline and Target Architectures for each of the manufacturing plants. A
gap analysis between the architectures will then validate the approach, and determine the Transition
Architecture needed to achieve the target state.
D.
The team should conduct a pilot project that will enable vendors on the short list to demonstrate
potential solutions that will access the concerns of the stakeholders. Based on the findings of that
pilot project, a complete set of requirements can be developed that will arrive the evolution of the
architecture.
The-Open-Group-OG0-092 Practice test unlocks all online simulator questions
Thank you for choosing the free version of the The-Open-Group-OG0-092 practice test! Further deepen your knowledge on The Open Group Simulator; by unlocking the full version of our The-Open-Group-OG0-092 Simulator you will be able to take tests with over 74 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 74 questions.
What to expect from our The-Open-Group-OG0-092 practice tests and how to prepare for any exam?
The The-Open-Group-OG0-092 Simulator Practice Tests are part of the The Open Group Database and are the best way to prepare for any The-Open-Group-OG0-092 exam. The The-Open-Group-OG0-092 practice tests consist of 74 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The The-Open-Group-OG0-092 database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with The-Open-Group-OG0-092 Simulator will also give you an idea of the time it will take to complete each section of the The-Open-Group-OG0-092 practice test . It is important to note that the The-Open-Group-OG0-092 Simulator does not replace the classic The-Open-Group-OG0-092 study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the The-Open-Group-OG0-092 exam.
The-Open-Group-OG0-092 Practice test therefore represents an excellent tool to prepare for the actual exam together with our The Open Group practice test . Our The-Open-Group-OG0-092 Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our The-Open-Group-OG0-092 Simulator and how our unique The-Open-Group-OG0-092 Database made up of real questions:
Info quiz:
Quiz name:The-Open-Group-OG0-092
Total number of questions:74
Number of questions for the test:50
Pass score:80%
You can prepare for the The-Open-Group-OG0-092 exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our The-Open-Group-OG0-092 Simulator.
Use our Mobile App, available for both Android and iOS devices, with our The-Open-Group-OG0-092 Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all The-Open-Group-OG0-092 practice tests which consist of 74 questions and also provide study material to pass the final The-Open-Group-OG0-092 exam with guaranteed success.
Our The-Open-Group-OG0-092 database contain hundreds of questions and The Open Group Tests related to The-Open-Group-OG0-092 Exam. This way you can practice anywhere you want, even offline without the internet.